Right the First Time · Prevention and Capability Build

The cheapest amendment is the one the design never needed.

Rescue deals with what has already gone wrong. This is the other door: science and operations at one table before the protocol locks, and your own team trained to hold the line after.

One Door Each Way

Protocol lock is a one-way door.

Before it, a change is a redline. After it, the same change is an amendment with a review board, site contracts, system rebuilds, and reconsent attached. Both doors are open. Only one of them is cheap.

Same decision, two very different prices.

Every item below is the same underlying question. The only variable is which side of the lock it gets asked on.

Asked after the lock
  • Eligibility reopened as a substantial amendment
  • Enrolled participants reconsented
  • Sites added because the first list did not enroll
  • Enrollment shortfall found once the window is gone
  • Change orders traced back to a scope written loosely
  • Systems and training rebuilt to match the new version
Asked before the lock
  • Draft criteria tested against real patient populations
  • Visit burden and washout checked against actual practice
  • Sites ranked on verified counts, not survey answers
  • Enrollment forecast built from data, not from optimism
  • Scope, assumptions, and unit costs fixed before the price
  • One governed plan the sponsor, CRO, and sites all hold
SOWThe pre-award stop in the 5-Stage-Gate Review System: protocol and SOW reviewed before the price is set. SETA Study Execution Team that puts the functions that can see the problem in the room while the fix is still cheap.

Right the First Time is not a slogan on this page. It is the gate that has to be passed before anybody signs.

The Window · Published Industry Benchmarks

Amendments are not all unavoidable. Sponsors themselves judge a share of them preventable.

Regulatory requests and new safety information will always drive protocol change, and no method prevents those. In Tufts CSDD benchmarking, sponsors and CROs reviewing their own amendments judged 23 percent completely avoidable and a further 22 percent somewhat avoidable, naming protocol design flaws, narrative errors, and infeasible eligibility criteria among the causes. A later Tufts study puts the avoidable share lower. That preventable slice, whatever its exact size in your portfolio, is the category a pre-lock gate can reach.

Benchmark 01 · Prevalence
76%

Protocols now amended

of Phase I to IV protocols carry at least one substantial amendment, up from 57 percent in 2015. The mean number of amendments per protocol has climbed 60 percent to 3.3.

Source: Tufts CSDD · Getz et al. · Ther Innov Regul Sci · 2024
Benchmark 02 · Cycle Time
260days

Need-to-amend to final approval

Average time from identifying the need to amend through the last oversight approval. Sites operate on divergent protocol versions for a mean of 215 days across that window. This is the full approval window rather than schedule time lost outright.

Source: Tufts CSDD · Getz et al. · 2024
Benchmark 03 · Timing
~1 in 3

Arrival before the first dose

In Tufts CSDD benchmarking, nearly one third of amendments were implemented before the first study volunteer received the first dose. Later Tufts work measures against first patient first visit and reports a smaller share. On either measure, a meaningful block of amendments arrives before a single patient is dosed, which is the window a design gate can reach.

Source: Getz · Applied Clinical Trials · September 2018 · see also Tufts CSDD 2022 benchmarks
Where the Leverage Sits

Call before the protocol locks and the work is preventing the amendment. Call after, and the work is implementing it.

Study Execution Team · SET

Usually somebody saw it coming. They had no vote.

Design error is rarely a competence failure. It is a sequencing failure: criteria are set, and the functions that know the enrollment will not work are consulted afterward. SET changes the order.

One table, before the protocol closes.

In prior roles the principal chaired Study Execution Team advisory committees at a global biopharmaceutical sponsor, spanning Medical Affairs, HEOR, Clinical Pharmacology and Exploratory Development, and Pharmacovigilance, aligning methodology, tactics, and technology across the portfolio. On this engagement SET names the sponsor-side committee, convened inside your organization and chaired until your own people chair it. Where Clinical TrialRx convenes a Study Execution Team of outside specialists for a data-partner program, that is the same method applied to a different seat.

Who is in the room
  • Clinical development and the medical lead
  • Clinical operations and study start-up
  • Feasibility and site selection
  • Biostatistics and data management
  • Regulatory and pharmacovigilance
  • Outsourcing, procurement, and finance
What has to clear the table
  • Every inclusion and exclusion criterion, with its purpose stated
  • The eligible population the criteria actually describe
  • The site list, ranked on verified counts
  • Visit burden against real-world practice patterns
  • The enrollment forecast, and who owns it
  • Scope and assumptions, written before the price
Delivery record under the same gates, in rescue and oversight engagements
98%Fewer SOW and UAT set-up errors, across 300+ global protocols and 900 projects
38Days ahead of schedule, average interim and final data locks
97%Studies closed within approved budget
78%Rise in Voice-of-Client ratings

Career figures reflect the principal's documented record in prior roles. Past results do not guarantee future outcomes.

Right the First Time · 5-Stage-Gate Review System

One path from SOW to data lock. The first stop is the one that prevents the rest.

SOW
Pre-award
SOW and Bid

Protocol and SOW reviewed before the price is set

G1·G2
Award · KOM + 4 wks
Strategy and Plan

Team, scope, and schedule baselined

G3
First patient − 4 wks
Readiness

Sites, training, and risk log ready

G4
25% · 75% · last patient
Enrollment Checks

Reviews at every enrollment milestone

G4n
Data lock − 3 months
Lock Readiness

Data cleaned and queries closed early

G5
eTMF final − 4 wks
Close-Out

Audit-ready file and lessons learned

Weekly internal core teamWeekly client meetingWeekly budget review with financeMonthly review with leadership
Build · Transfer · Exit

Many engagements build and then stay. This one is designed to leave.

The deliverable is not a report and it is not a permanent seat. It is a team that holds the metrics without outside help, and people inside your organization who can teach the next group how.

Step 1 · Diagnostic

4 to 6 weeks · Fixed scope

One therapeutic area's start-up and protocol workflow mapped end to end. Your own last protocols reviewed to separate the design-driven amendments from the unavoidable ones, and the days and dollars attached to each. The deliverable is a business case built on your numbers, not on a benchmark.

Step 2 · Pilot

One therapeutic area or one study · Through protocol lock

SET convened and chaired through one protocol to lock. The pre-award SOW stop run live. Your people trained and certified alongside it, and the results measured against the baseline the diagnostic established.

Step 3 · Scale and Exit

Portfolio-wide · Only after the pilot proves out

Your own chairs running SET across the portfolio, and an internal group able to train the next cohort. Exit is written into the contract and tied to your team holding the metrics agreed in the diagnostic baseline, not to a calendar date.

Durations scale with portfolio size and protocol count. The window for each step is set in the diagnostic, against your own baseline, before anything is committed.

4PM Centers of Excellence built across the Americas, EU, and APAC
300+Global protocols and 900 projects under the delivery method
20Countries reached by the Project Management Center of Excellence standards and training

If your next protocol has not locked yet, that is the conversation.

Questions Executives Ask

Straight answers, before the first call.

How is this different from trial rescue?

Rescue addresses a study that is already off course, and it is scoped to recovery. Right the First Time is scoped to a study that has not started, or a protocol that has not locked. Same method, same gates, same governance, applied at the point where a change is still a redline rather than an amendment. Sponsors use both: one for the program that is burning now, one for the next three that are still on paper.

When is the right time to bring this in?

While the protocol is in development and before it goes to a review board. The pre-award stop reviews the protocol and the SOW before the price is set, which is also the last point at which scope assumptions can be fixed without a change order. A new program starting, an inspection finding, a CRO transition, or a reorganization in clinical operations are the usual triggers.

Do you replace our CRO, or our internal team?

Neither. On any single study the principal works for one side only, disclosed at engagement. The work is to hold every party to the plan that was bought, and to raise the questions your own functions already wanted to raise before the document closed.

What reduction in protocol amendments is actually claimed?

Only the categories a design gate can reach. Amendments driven by regulatory agency requests, new safety or dose information, or a change in standard of care are not claimed as preventable, because they are not. The target is set against your own baseline during the diagnostic, measured on your own protocols, and agreed before the pilot begins rather than promised in a proposal.

How does the engagement end?

On an exit criterion written into the contract and tied to performance: your team holds the metrics agreed in the diagnostic baseline without outside support, and your own people chair the Study Execution Team. The engagement is designed so that the capability stays when the engagement does not.

Engage Clinical TrialRx

Your next study has not started. That is the cheapest day to fix it.

Start with a no-obligation protocol risk call. We will look at where your next protocol is carrying avoidable design and scope risk, which of the seven reasons sponsors say NO is already in play, and what a fixed-scope diagnostic would measure on your own numbers.

Headquarters
2 East Main Street
Pittsboro, IN 46167
Remote delivery worldwide · on site when needed